INSTALLATION


BACK TO BACK
Basic installation in Auckland (20km from CBD) includes 3 meters of coil/pipe. This means the two units must be installed directly opposite each other on an exterior wall.
Contact us to find out other ways you can install the units. A site visit may be required.
Certificate of Compliance will be produced for the electrical work.
Basic installation includes electrical work (typically a local power outlet) within 3 meters of the outdoor unit.
