INSTALLATION

Sizing-Guide_20170802_1.jpg
BACK TO BACK ME.jpg

BACK TO BACK

Basic installation in Auckland (20km from CBD) includes 3 meters of coil/pipe. This means the two units must be installed directly opposite each other on an exterior wall.

Contact us to find out other ways you can install the units. A site visit may be required. 

Certificate of Compliance will be produced for the electrical work.

Basic installation includes electrical work (typically a local power outlet) within 3 meters of the outdoor unit. 

footer2.png